Hi to all,
does anyone knows how to schedule a job to run in seconds time interval ?
I have found the sysobschedule table in msdb but even if i change the
freq_subday_type to 2 (seconds) the job doesn't run in seconds.
The only solution i imagine is to run once the Stored Procedure i want
and add a WAITFOR DELAY '00:00.05' command,
so this will run it constantly (and for ever...)
Is there any other way to accomplish the same thing,
or are there any side effects to have an sp to run forever
with the WAITFOR statement '
Thanks a lot for any help!
Anthony BoudouvasGert Drapers posted an undocumented way around this
limitation awhile back- it sounds like you had the right
idea on how to go about it, maybe something just got missed
in how you implemented it. Check the following example:
http://tinyurl.com/q0vv
-Sue
On Tue, 7 Oct 2003 13:08:59 +0200, "Anthony Boudouvas"
<anthonyb@.mediatel.gr> wrote:
>Hi to all,
>does anyone knows how to schedule a job to run in seconds time interval ?
>I have found the sysobschedule table in msdb but even if i change the
>freq_subday_type to 2 (seconds) the job doesn't run in seconds.
>The only solution i imagine is to run once the Stored Procedure i want
>and add a WAITFOR DELAY '00:00.05' command,
>so this will run it constantly (and for ever...)
>Is there any other way to accomplish the same thing,
>or are there any side effects to have an sp to run forever
>with the WAITFOR statement '
>
>Thanks a lot for any help!
>Anthony Boudouvas
>|||Ok, it did work that way.
Thanks a lot!
anthonyb
"Sue Hoegemeier" <Sue_H@.nomail.please> wrote in message
news:2aj5ov8bk7klsmgf79hgn70285g8fk112i@.4ax.com...
> Gert Drapers posted an undocumented way around this
> limitation awhile back- it sounds like you had the right
> idea on how to go about it, maybe something just got missed
> in how you implemented it. Check the following example:
> http://tinyurl.com/q0vv
> -Sue
> On Tue, 7 Oct 2003 13:08:59 +0200, "Anthony Boudouvas"
> <anthonyb@.mediatel.gr> wrote:
> >Hi to all,
> >
> >does anyone knows how to schedule a job to run in seconds time interval ?
> >I have found the sysobschedule table in msdb but even if i change the
> >freq_subday_type to 2 (seconds) the job doesn't run in seconds.
> >
> >The only solution i imagine is to run once the Stored Procedure i want
> >and add a WAITFOR DELAY '00:00.05' command,
> >so this will run it constantly (and for ever...)
> >
> >Is there any other way to accomplish the same thing,
> >or are there any side effects to have an sp to run forever
> >with the WAITFOR statement '
> >
> >
> >Thanks a lot for any help!
> >
> >Anthony Boudouvas
> >
>
Showing posts with label knows. Show all posts
Showing posts with label knows. Show all posts
Monday, March 26, 2012
Wednesday, March 7, 2012
Job disabled while schedule enabled
Just curious to hear if anyone else has experiences this or knows a reason
why it maybe should be this way...
I have some jobs that are disabled accourding to the Job Activity Monitor view in Mgmt Studio. However, if I open the schedules details, this view says Enabled. Can a schedule be enabled for a job, even if the job in itself is
disabled maybe?
But, I can't see any enable/disable flag in the sysjobschedules table,
only in sysjobs.Yep, it's possible to disable a schedule in a job. Disabling all schedules in job effectively has the same result as disabling the job.
Just checked, but sysjobschedules does have a column called "enabled" in SQL Server 2000!|||The schedule details have apparently moved to some other table in SQL Server 2005. I forgot to tell we're running 2005.
why it maybe should be this way...
I have some jobs that are disabled accourding to the Job Activity Monitor view in Mgmt Studio. However, if I open the schedules details, this view says Enabled. Can a schedule be enabled for a job, even if the job in itself is
disabled maybe?
But, I can't see any enable/disable flag in the sysjobschedules table,
only in sysjobs.Yep, it's possible to disable a schedule in a job. Disabling all schedules in job effectively has the same result as disabling the job.
Just checked, but sysjobschedules does have a column called "enabled" in SQL Server 2000!|||The schedule details have apparently moved to some other table in SQL Server 2005. I forgot to tell we're running 2005.
Subscribe to:
Posts (Atom)